Changes between Version 3 and Version 4 of SponsoringPrograms/STF/2025
- Timestamp:
- Nov 15, 2024, 7:36:51 PM (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
SponsoringPrograms/STF/2025
v3 v4 81 81 82 82 83 == =Template Project Proposal83 == Template Project Proposal 84 84 85 === = Overview85 === One line summary of the proposed work 86 86 87 The best template project the world has ever seen! 88 Copy and paste this template and leave it intact for others. 87 Example: Classify and fix outstanding issues identified by Coverity 89 88 90 **Developer**: Tom Templateson <tt@ffmpeg.org> 89 === Description of the work 91 90 92 **Duration**: 4 months 91 Example: Coverity is a static code analysis system that is used to analyze FFmpeg code to find bugs with an emphasis on quality and security issues. There are currently 677 outstanding issues identified by Coverity (https://scan.coverity.com/projects/ffmpeg?tab=overview). Some of these issues are false positives while others could open the door to security vulnerabilities. The objective of this work is to identify the Coverity issues that are not false positives, and fix as many as possible. 93 92 94 === =Milestones93 === Milestones 95 94 96 ==== =Milestone 195 ==== Milestone 1 97 96 98 * **Description**: Amazing template milestone to start. 97 ===== Description 99 98 100 * **Deliverables**: Press the start button.99 Example: Review all outstanding Coverity issues and, for each one, determine whether it is a false positive. 101 100 102 * **Duration**: 1 months 101 ===== Deliverables 103 102 104 ===== Milestone 2 103 Example: List of both false positive and real issues posted to the FFmpeg dev mailing list. 105 104 106 * **Description**. Half way through being amazed. 105 ===== Requested compensation (in USD or Euros) 107 106 108 * **Deliverables**. Get ready to be amazed. 109 110 * **Duration**: 2 months 111 112 ===== Milestone 3 113 114 * **Description**. Show checkered flag. 115 116 * **Deliverables**. Determine the dev being amazed the most. 117 118 * **Duration**: 1 months 107 ==== Milestone 2 119 108 120 109
